

Some photos taken of the layout at various times of it's construction.

Andre Rieu comes to Summerfield.


EL51 On it's first run through Summerfield

S310 ready to leave the loco workshops. No time for a clean up.
Yes sometimes things do go wrong!!!!!
Forgot to switch over to the passing loop.


Container Terminal and Loco Workshops In The Back Ground

Close-up of the Container Terminal

Another View Of The Container Terminal and Loco Workshops

Three T's pass through with a local freight train.
(Foreground construction work still under way)

A container train bound for Adelaide, passes through.
(the bridge leading to the yard still to be completed)

The Container Terminal has been removed and containers are being unloaded with a fork lift until the new terminal is built. The former container terminal area is to become a fuel depot. The Loco Workshops continue to operate.
(I had just finished fitting DCC chips to the T's as they await there final adjustments.)

C class passing through Summerfield.

Part of Main Street.
(Track ballasting still to be completed)

A general view of the layout as construction continues.
(The old control panel, pre DCC days sits on a chair)

Loco Workshops with track work still to be ballasted.

The station area under construction, prior to placing on the layout.

The station area fitted in place as construction continues.

A view of the yard area

A pair of T's passing through Summerfield Station